Methodology
Evidence before assumptions.
How SEDGE moves an opportunity from claim to financeable project, and what each step produces.
Opportunity
A site, a power position or an existing project enters the workflow with a stated objective.
Verify
Separate documented facts from claims: land control, grid evidence, planning status, connectivity.
Identify gaps
Name what blocks development and what evidence is still missing, with the level of verification behind each item.
Development readiness
Close gaps in a defined sequence, coordinating qualified specialists where regulated or technical work is required.
Financeability
Assemble the structure, evidence and materials investors and lenders require before they will engage.
Verification levels
Every fact carries its source.
Nothing is presented as verified because it is plausible. Each item in a SEDGE report is labelled with how it is evidenced and when it was last checked.
Sourced from public records or published material.
Assembled and cross-checked by SEDGE.
Confirmed in writing by the owner, utility or operator.
Checked by a qualified independent specialist.
Evidenced by a binding or formal document.
Public framework
SEDGE Site Readiness Framework — Spain
What we verify before calling a site data-center ready. This is the framework we apply, published openly.
Power evidence
Application, offer or connection agreement; voltage, capacity, substation, reinforcement dependency and dates. Indicative information is recorded as indicative.
Land control
Ownership, option, lease or conditional agreement; exclusivity; boundaries; access rights; encumbrances.
Planning
Zoning classification, permitted use, planning route, municipal position, expected consent sequence.
Fibre
Route availability, carrier presence, distance to existing infrastructure, latency to relevant hubs.
Environment
Protected designations, water, noise, environmental assessment requirement, known constraints.
Delivery timeline
Realistic sequence from today to energisation, with the dependencies that define the critical path.
Unknowns
What is not known, why it matters, and what study or confirmation would resolve it.
Verification levels
Each item labelled L1–L5 with the date it was last verified.
Illustrative assessment — methodology demonstration
How the output reads.
The structure below is an illustration of the report format only. It does not describe a real client, site or engagement, and the values are not data.
An assessment does not end with a score. It ends with a sequence: what to resolve, in what order, with which specialist, and what each item changes for financeability.
Status model
Clear boundaries
- SEDGE does not replace licensed engineers.
- SEDGE does not treat indicative grid information as secured power.
- SEDGE does not provide regulated investment advice.
- SEDGE does not raise capital, place securities or work on fundraising success fees.
- SEDGE does not present unverified project claims as facts.
- SEDGE coordinates specialist technical, legal and regulated work where required.
Have a site, a power position or a project that needs to become financeable?
Tell us what you have and what you are trying to determine. Six fields to start; technical detail only if we continue.